Two Q tons installed at DUWO student accommodation in Leiden January 2016 wwwmhiaecom 020 7025 2750 ID: 847682

accommodation student duwo ton student accommodation ton duwo hot water leiden 2016 gas heavy mhi system sanitary industries solution

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "Case Study Student Accommodation" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 Case Study: Student Accommodation Two
Case Study: Student Accommodation Two Q - ton’s installed at DUWO student accommodation in Leiden January 2016 www.mhiae.com 020 7025 2750 © 2016 MITSUBISHI HEAVY INDUSTRIES EUROPE, LTD. All Rights Reserved. Fact File Project: DUWO Student Accommodation Project outline: Replace existing gas fired boiler Installer: Vink Installers Distributor : Coolmark BV Products: Two MHI Q - ton system One 1,500 litre sanitary hot water storage tank DUWO is the largest corporation in student accommodation in the Netherlands and operating in the urban agglomeration (Randstad) and middle of the Netherlands. The student accommodations located in the centre of the university city of Leiden was identified by DUWO to install their first two Q - ton CO ₂ heat pumps from MHI. The building consists of identical blocks, each accommodates 160 students and consumes 10,000 litres of sanitary ho

2 t water per day. One part is still u
t water per day. One part is still utilising a gas boiler, while the other part is using the MHI’s Q - ton system to supply the domestic hot water to the students. DUWO’s main reasons to install a highly efficient system was to make sustainable solution instead of using gas and to improve the efficiency and reliability. The Q - ton solution from Mitsubishi Heavy Industries was installed by Vink installers. Q - ton is not only used for the supply of the sanitary hot water but also to reheat the distribution circuit in the respect of the local anti - legionella regulation. DUWO in the city of Leiden is very pleased with the results as the efficient stand alone MHI Q - ton solution produces enough hot water at all times of the day under cold climate conditions making this convenient for students . Image 3 Case Study: Student Accommodation Two Q - ton’s installed at DUWO student accommodation in Leiden January 2016 www.mhiae.com 020 7025 2750 © 2016 MITSUBISHI HEAVY INDUSTRIES EUROPE, LTD. All Rights Reserved.