H Rauer DLR PF H KinterA Salado KayserThrede 2 Activities Mission selection in Feb 2014 Payload industrial management is being assigned for bridging period and B1 Phase to ID: 795523

tou phase plato meeting phase tou meeting plato camera deliverables payload requirements team progress preparation management working kick documents

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "PLATO PLATO TOU KO MEETING‎" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

PLATO

PLATO

TOU KO MEETING‎

H.

Rauer

(DLR PF)

H. Kinter/A. Salado

(Kayser-Threde)

Slide2

2Activities

Mission selection in Feb. 2014

Payload

industrial management is being assigned for “bridging period” and B1 Phase to

Kayser-Threde

Status

of

payload

teams

, PDC, PSPM

is

reviewed

„Kick-off“ Phase B1:

July

16/17

Slide3

3Activities since

selectionConsortium

:

Consortium

working

groups

have

(

re

-)

formed

:

CCD

working

group

(

chair

D. Walton)

Data

P

rocessing

Algorithms

Working

Group

(

chair

: R. Samadi)

Telescope

Optical Unit Working Group

(

chair

: R. Ragazzoni)

Slide4

Data processing group4

A Data Processing Algorithms Working Group has

been

re-initiated

PLATO-ALGO

(

chair

: Réza Samadi):

in charge of the study and the definition of the on-board and on-ground data processing algorithms (L0/L1)

provide specifications for the development of the on-board and on-ground

softwares

The group includes members of the

payload,

PDC

and PSPM teams

Slide5

Telescope Optical Unit group

5TOU team (

chair

:

Roberto Ragazzoni):

First meeting in B1 phase is

scheduled on June 11 in Catania

update

on the

status

plan

the next study phases.

Slide6

Upcoming meetings6

1st

P/L Meeting

has

been

May 06/07, 2014 @ DLR, Berlin

Consortium

kick-off

meeting

on

July

16/17, 2014,

@ DLR,

Berlin

PDC

meeting

July

15, Berlin

TOU

meeting

June 11, Catania,

Italy

2

nd

P/L Meeting proposed Fall

2014

Workshop on planet

formation

, Sept., London

PLATO 2.0 Science Workshop

December

2014,

Italy

Slide7

7

Slide8

PLATO Camera Management Support Overview

Slide9

KT Team Organization and responsibilitiesMain Phase B1 Preparation

ActivitiesB1 Schedule Overview: KT Questions to TOU teamAgenda

Slide10

PLATO Payload Consortium

Slide11

PLATO Payload Management Key Personnel

Name

Function

Richard Haarmann

PIPM

Bernd Schulz

PA/QA Manager

Alejandro Salado

Payload

Sys. Engineering (PTC)

Hilda Kinter

Camera Project Manager (

CPM)

PIPM

Deputy

Valery Mogulsky

Camera Systems

Engineering

Roberto Montedori

Payload AIV Manager

(

PAM)

Gisbert

Peter

DPS Project Manager (DLR)

Slide12

Camera Management at Kayser-Threde:Key Personnel roles and responsibilities definedSupport the TOU in the preparation of phase B1

Interface to Camera consortium membersTechnical and managerial contact pointsMain Phase B1 Preparation Activities

Slide13

Phase B1 PlanningDetail roadmap until KO Phase B1 and beyondSynchronization of all partner activities

Major Milestones for the Phase B1Main Phase B1 Preparation Activities

Date

Event

15.-16. July 2014

Phase B1 Kick-Off

March 2015

PLATO Design Consolidation Review (PDCR)

October 2015

PLATO

B1

data package

delivery for

SRR

November - December 2015

PLATO System

Requirements Review (SRR)

March 2016

Mission Adoption & IPC approval

April 2016

Kick-off Phase B2/C/D

January 2024

PLATO Launch

Slide14

Preparation B1 Kick-Off Data PackageMain Phase B1 Preparation Activities

Establish an updated Specification Tree to define the interrelation between the single PLATO P/L

component specifications

 Basis for the traceability of single requirements and interface management

Definition of all required documents

for the B1 Kick-Off

 Comparison with existing documentation to identify necessary inputs

Completion /

annotation of existing specifications

 Utilization as applicable documents for the B1 work upon PDCR

Slide15

1st P/L Meeting has been on 06./07.05.2014Bring P/L consortium togetherStart to resume P/L teamsPhase B1 KO is scheduled for 16./17.07.2014Official Start of Phase B1

All work packages are already definedTasks to be done between KO and 2nd P/L Consortium Meeting will be defined2nd P/L Meeting proposed Fall 2014All specifications and belonging annotations/supplements are available as basis for the B1 development workPhase B1

Slide16

PLATO Phase B1 Schedule

Slide17

Overview of major Phase B1 Deliverables

MeetingDateDeliverablesKO16.07.14

* Drafts of

TOU Requirements

Specification,

Camera

Development

& Verification Plan,

List of

Deliverables,

2nd P/L Meeting

15.09.14

* First

issue of above documents

PM1

18.11.14

Progress report + specified deliverables

PM2

20.01.15

Progress report + specified deliverables

PDCR delivery

02.03.15

Progress report + specified deliverables

PM3

12.05.15

Progress report + specified deliverables

PM4

21.07.15

Progress report + specified deliverables

PM5

22.09.15

Progress report + specified deliverables

SRR delivery

02.11.15

Camera

Reports, models, Camera URDs and I/F documents

*

drafts to be prepared

by KT

Specified deliverables defined in the List of

Deliverables, which may include

Camera Reports (design, budgets, performance,

straylight

, thermal, structural, risk assessment), MAIV plan, Management Plan, mathematical

models

Slide18

Communication between TOU team and KT

List of all deliverables to be defined and finalised by 2nd P/L Meeting PMs to be held at TOU site or by

Webex

. Required documents and Progress Reports including status of AIs to be delivered at least five working days before the meeting

Regular bi-weekly

telecons

between TOU

lead team

and KT:

brief discussion of working progress, identified problems, needed inputs

etc

the traceability of single requirements and interface management

Meeting when necessary with other

Camera/Payload/PLATO

teams by

Webex

(organised by KT). For critical topics, like I/F discussions, face to face meeting are preferable

Slide19

Goals Phase B1: To achieve a sufficient level of technical maturity to ensure a ‎successful SRR.

system requirements for the selected ‎architectures successfully validated system

requirements

derived

confidence

on the ‎readiness levels of various technologies.‎

Payload Camera Subsystem Status Summary:

Goals Phase B1

consolidating

the

requirements

on system and subsystem level ‎and their

traceability

consolidating

internal interfaces

, assessing requirements for ‎

external

interfaces

consolidating

performance

models

consolidating

and defining

operational modes

of the payload and its ‎various subsystems and components

.

validating

the set ‎of

system and subsystem requirements

Establish a

verification strategy

consistent with programmatic limitations and ‎required scientific value.‎

Develop

technology maturation programs

in order to achieve the required TRL levels at ‎SRR

Slide20

Team?Several Institutions (INAF, Univ. Bern, Stockolm Obs., Univ. Firenze) + Industrial Partners (Selex ,

Medialario-Sagem, Seso, RUAG, APCO Technologies) led by INAF (Interface to Camera team)Current Status?Optical Design + options availableBreadboard/Prototypes: TOU AIV procedure already performed

(

TOU Optical and Thermal

Performance)

Further Breadboard

with AIV and thermal behavior

identified

AIV

procedures

under development with

serial production in

mind

Next Steps

?

Answer

MEMO questions

Telescope

Optical Unit (TOU

)

Status Summary:

Slide21

Issues/questions to the TOU Team

Slide22

Questions to/inputs from TOU team:List of TOU team including percentage allocation for PLATOIs there a Central point for Camera document collection?

List of available technical documents: List of MEMO QuestionsComponent I/FsOperational modes, states, and transitionsPerformance models or simulatorsBehavioural models or simulators

Performance

wrt

requirements

Model philosophy

Assumptions employed in analyses

Requirement specification

Open issues and decisions

Current risks and their mitigation strategies

Main Phase B1 Preparation Activities