/
Large size GEM Detectors Large size GEM Detectors

Large size GEM Detectors - PowerPoint Presentation

candy
candy . @candy
Follow
27 views
Uploaded On 2024-02-09

Large size GEM Detectors - PPT Presentation

in TEMPEEM Rui De Oliveira 6242011 1 Rui De Oliveira GEM double mask Vs GEM single mask CERN workshop and industry capabilities New stretching method Equipment upgrade New building ID: 1045869

mask gem building oliveira gem mask oliveira building single double 2011rui cern stretching industry workshop upgrade process etch detector

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Large size GEM Detectors" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1. Large size GEM Detectorsin TE/MPE/EMRui De Oliveira6/24/20111Rui De Oliveira

2. GEM double mask Vs GEM single mask CERN workshop and industry capabilitiesNew stretching methodEquipment upgrade New building 6/24/20112Rui De Oliveira

3. 6/24/2011Rui De Oliveira3 GEM FoilPresent max size 1.2m x 0.6m Future max size 2m x 0.6m

4. 6/24/2011Rui De Oliveira4Copper etchBase material : Polyimide 50um + 5um on both sidesGEM double mask Vs GEM single MaskBase material Hole patterning in Cu Polyimide etch Bottom electro etch Second Polyimide Etch Limited to 40cm x 40cmMask precision LDI trialsLimited to 2m x 60cmBase material EquipmentDouble mask Single mask

5. 6/24/2011Rui De Oliveira5GEM Double mask Vs GEM single MaskSimilar patterns , similar behaviorSame materialAngles can be adjusted to application (High gain – Charging up)

6. COMPASS6GEM double mask examplesLHCb-Muon triggerTOTEM GEMs, T. Hilden,V. Greco…WindowDrift electrodeGEM stackPad Plane Support & Media-DistributionCooling Support & LV- DistributionFront-End ElectronicShielding Cover & Read-out PlaneB. Surrow, STAR GEM6/24/2011Rui De OliveiraProduction quantities : around 500 GEMs/ year in average

7. 7GEM Single mask examplesKLOE – Cylindrical 3 GEM DetectorGEM 800mm x 500mmCMS 3 GEM DetectorGEM 1.1m x 500mm Production quantities: 100 Gem / year 6/24/2011Rui De Oliveira

8. Kloe inner tracker (Frascati) 75 Compass pixel detector (CERN) 10 CMS Muons detector upgrade (CERN) 360? 480?Panda inner tracker (Munich) 90Florida Tech university (home land security) 1000?ILC calorimeters ( Arlington Texas) 10000 ?High spacial resolution Tracker ( Jefferson Lab) 250Etc…GEM single mask projects in progress 6/24/20118Rui De Oliveira

9. GEM double mask Vs GEM single mask CERN workshop and industry capabilitiesNew stretching methodEquipment upgrade New building 6/24/20119Rui De Oliveira

10. 2011Up to 15 GEMs 1m x 0.5m / month technicianCost : around 1200 CHF/GEM150 GEM/ year2012Up to 24 GEMs 1m x 0.5m / month technicianCost: around 900 - 1000 CHF/GEM (Compass GEM 700 CHF)240 GEM/yearPresently 2 technician are 100% involved in GEM productionWe can extend man power to 3 technicians if neededCERN PCB workshop capacities 6/24/201110Rui De Oliveira

11. Scienergie (Japan)Limited to 300mm x 300mmLaser technologyTechetch (US)Limited to 400mm x 400mmSTD double glass maskTechtra (poland)Limited to 100mm x 100mmSTD double polyester maskNew-Flex (Korea)Limits not known yet 2m x 0.6m?STD Double glass mask or Single mask?Industry possibilities6/24/201111Rui De Oliveira

12. -Visit November 2008, organized by Changwon university-Activities: circuits for Telecom, displays and Automotive-400 Employee-Situation: South Korea near Seoul-New Visit in June 2011, organized by Seoul University -Full technology transfer-New Flex has produced first 8cm x 8cm GEM (being measured)-More details in the next talk from professor Sung Park New Flex ( South Korea)6/24/201112Rui De Oliveira

13. GEM double mask Vs GEM single mask CERN workshop and industry capabilitiesNew stretching method (slides from Andrei Marinov)Equipment upgrade New building 6/24/201113Rui De Oliveira

14. 14Small proto: new mechanicsGEM foil with the protection resistorsRead-Out board, bottom planeRead-Out board, top plane, connectorFrame for stretchingPlacing the foilMounting the frame and stretchingStretched GEM foilPlacing the Read-OutAssembled in 1 hour!6/24/2011Rui De Oliveira

15. GEM foil tests in CO2 have been done by applying HV to each GEM and measuring the current.Nothing suspicious has been found. The drift was also tested up to 3.5kV, measured current was constant 0.3nA.6/24/201115Rui De Oliveira

16. 16Next step for the small protoSmall prototype in the setup, connected to the gas.The next step is to make full set of tests (gain, uniformity)6/24/2011Rui De Oliveira

17. VG3VG2VG16/24/201117Rui De Oliveira

18. No spacers in active areaReduced assembly time1 hour for 10cm x 10cm detector (1 technician)2 hours estimation for 1m x 0.6m detectorNo gluing , no solderingRepair possibleRe opening possibleGEM exchange possibleFinal Gas test with full detector possibleA new detector 30cm x 30cm is in productionNew GEM stretching method6/24/201118Rui De Oliveira

19. GEM double mask Vs GEM single mask CERN workshop and industry capabilitiesNew stretching methodEquipment upgrade New building 6/24/201119Rui De Oliveira

20. Goal: Set up a production line being able to face most of the future requests for large GEM productions (from 1 piece to few hundreds, size up to 2m x 0.6m) First step: Machine procurement and installation-The purchasing process is ended-We have bought 3 new machines-1 machine is in operation-2 are still at the installation process level planning : 3 machines running September 2011Second step: -redefine all the process parameter related to the new equipments-Build some prototypes of the # detectors We are in the process to hire a technical engineer for 2 years (AIDA Funds)Machine investment for GEM production6/24/201120Rui De Oliveira

21. UV exposure unit moving from 2m x 0.6m  2.2m x 1.4m 30 years old equipment Building 254GEM alcohol resist stripping GEM electro etch moving from 1m x 0.6m 2.2m x 0.6m 10 baths compactedGEM polyimide etch moving from 1m x 0.6m  ? 10 30 GEM/day roll to roll compatible no tooling needed Building 2546/24/201121Rui De OliveiraMachine investment for GEM productionNot yet InstalledAlready delivered

22. GEM double mask Vs GEM single mask CERN workshop and industry capabilitiesNew stretching methodEquipment upgrade New building 6/24/201122Rui De Oliveira

23. New Building 1076/24/2011Rui De Oliveira23

24. New Building 1076/24/2011Rui De Oliveira24

25. New Building 1076/24/2011Rui De Oliveira25

26. The Consultant company designing the building have been selectedThe preliminary design is about to be completedThe market survey for construction should be launch soonThe final design will be done with the consultant and constructorThe construction should start beginning of 2012The construction should end Mid 201340 square meter room reserved for MPGD assemblyAll the machines for large size detectors production are in the layoutArea 900 m2  1400m2 with optimized layoutMost of the baths will be replaced by compact machinesRooms are reserved for new processes (laser and plasma)New building 1076/24/201126Rui De Oliveira

27. GEM single mask process is stable CMS project can be done at CERN if neededThanks to new equipment the prices will dropThe new stretching method can reduce a lot the assembly timeBuilding 107 will help again to reduce prices.Conclusion6/24/201127Rui De Oliveira